2024-09-29
한어Русский языкEnglishFrançaisIndonesianSanskrit日本語DeutschPortuguêsΕλληνικάespañolItalianoSuomalainenLatina
peninsula all media reporter wang chunyan correspondent ding fei
green net coverage, fence installation, road repairs... on september 29, at the construction site of the crrc school (phase i) project, all construction areas were in full swing... it is reported that the crrc school in sifang zhihui port area the (phase i) project is located in the area surrounded by xinglong 1st road, sijizong 1st road, sijiheng 1st road and siji south road, covering an area of 38,000 square meters, with a planned total construction area of 31,000 square meters and a planned construction area of 17,200 square meters. the floor area ratio is 0.45. it is planned to build a 42-class school with a total investment of approximately 270 million yuan. the main construction contents of the project include teaching buildings, wind and rain playgrounds, canteens, lecture halls, outdoor sports fields, etc. at the same time, it is planned to build a community sports center of 2,050 square meters and 209 motorized parking spaces.
recently, the crrc school (phase i) project in the crrc sifang zhihuigang area, a key inefficient area in shibei district, obtained an earthwork construction permit, and construction fencing work is underway on site. the project is expected to be delivered in 2027, which will effectively alleviate the enrollment pressure in the city's central district, balance the distribution of educational resources, and further enhance the comprehensive strength of education in shibei district.
it is reported that the crrc school (phase i) project in the crrc sifang zhihui port area is of great significance to the improvement of educational resources in qingdao shibei district. as a key urban renewal project in shibei district, crrc sifang yunhui covers a variety of business formats such as industry, housing, education, heritage parks and commercial blocks, and will build a school with 42 classes. the construction of the school will further improve the infrastructure configuration of the area, optimize the layout of educational resources, and achieve balanced and high-quality development of compulsory education.