2024-09-25
한어Русский языкEnglishFrançaisIndonesianSanskrit日本語DeutschPortuguêsΕλληνικάespañolItalianoSuomalainenLatina
pay attention to detour
from september 26
shunyi district will
shunmi road (from baima road south to weijiadian north)
carry out overhaul project
the project is scheduled to be completed by november 15.
by then
the appearance of this section of road
will be further improved
the shunmi road (from baima road south to weijiadian north) overhaul project is a highway maintenance project of the municipal transportation commission in 2024. the project starts from the south of baima road in the south and ends at the north of weijiadian in the north, with a total length of 8 kilometers. the main contents of the project include road milling, disease treatment, and road surface repair.
shunmi road.
shunmi road is an important traffic artery in shunyi district, carrying a large number of vehicles and people. the existing road surface structure has serious defects such as large-scale cracks and potholes, which poses a traffic safety hazard and brings inconvenience to citizens. therefore, shunyi highway branch implemented this overhaul to further improve the road service level and extend the service life of the road.
detour signs have been installed on surrounding roads.
at present, many roads along the route and intersecting roads have been equipped with detour signs, construction signs and warning signs. "the project adopts a half-width construction and half-width guidance method. during the construction period, citizens can detour to surrounding roads such as zuodi road, limu road, beihan road, tonghuai road (northern section of changjin road), etc." cao song, deputy chief of the engineering department of shunyi highway branch, introduced.
before the project started, shunyi highway branch had visited villages, communities, businesses, and public service units around the construction area to explain the construction plan and guide routes. during the construction period, shunyi highway branch will reasonably arrange the construction plan, adopt implementation plans such as staggered construction and night construction, and at the same time increase traffic diversion efforts to minimize the impact of construction on traffic.
shun shun tips
please make travel plans and arrangements in advance. we apologize for any inconvenience caused by the construction. if you have any questions, you can call us at any time.
shunyi highway branch tel: 69461669
on-site person in charge phone number: 13520303676
source: beijing
author: beijing shunyi official release