news

four new roads to be added in southern chaoyang, beijing

2024-09-20

한어Русский языкEnglishFrançaisIndonesianSanskrit日本語DeutschPortuguêsΕλληνικάespañolItalianoSuomalainenLatina

recently
located in wangsiying area
jiaohuachang north road, boluoying east road
coking plant west 1st road, coking plant west 2nd road
construction of 4 roads started
let beijing chaoyang south
a denser road network and smoother travel
more convenient for residents and a more livable environment
let’s watch together
coking plant north road
connecting the northwest to the southeast, opening up the main artery
jiaohuachang north road is located in the middle of the jiaohuachang area, running from northwest to southeast. the main construction entity is beijing gonglian highway link co., ltd. it starts from taozhuang east road in the west and ends at the planned jiaohuachang east sixth road in the east. the designed length of the road is about 2.4 kilometers. it is planned as a city trunk road with a road red line width of 40 meters and a designed speed of 50 kilometers per hour.
previously, the area lacked a main urban road that runs through the entire region. the implementation of coking plant north road will greatly improve regional road connectivity and effectively solve regional transportation needs.
boluoying east road
convenient for teachers, students and parents, and improve regional convenience
the current planned boluoying east road is located on the east side of the 11th school, and the main construction body is the people's government of wangsiying township, chaoyang district, beijing. boluoying east road starts from jiaohuachang sixth street in the south and ends at boluoying north road in the north. it is about 0.5 kilometers long, the road grade is an urban branch road, the road red line is 25 meters, and the design speed is 30 kilometers per hour.
the road will effectively alleviate traffic congestion in the area during school commuting, provide a better traffic environment for teachers and students, and form a smooth traffic microcirculation around the campus.
coking plant west 1st road and west 2nd road
increase transportation options and provide support for line 7
coking plant west 1st road and coking plant west 2nd road run from northeast to southwest. they are small in size but have a strong presence. the main construction entity is cbd international company. the two roads effectively improve the road network around the resettlement housing project around the coking plant, and provide transportation connection for metro line 7.
rainwater, greening, traffic and lighting projects are currently being implemented simultaneously on west 1st road and west 2nd road of the coking plant. west 2nd road of the coking plant is scheduled to be basically completed by the end of december 2024.
the rise of the south, education first
realization of roads such as coking plant north road
it will effectively improve the quality of life of the 11th school and surrounding residents.
traffic happiness
optimize urban space and functional layout
promote urban renewal and improve urban carrying capacity
helping chaoyang to be "easy to study"
report/feedback