news

"industry and finance advance together" using financial momentum to "support" the power of a great power - ping an leasing safeguards the construction of a strong country

2024-09-11

한어Русский языкEnglishFrançaisIndonesianSanskrit日本語DeutschPortuguêsΕλληνικάespañolItalianoSuomalainenLatina

a great country must have important equipment. the important equipment of a great country is the backbone of the manufacturing industry and an important indicator of the core competitiveness of the manufacturing industry.
from power stations in alpine waters, green ecological construction to new energy development, the footprints of major engineering projects are spread across all areas of economic and social development, and also deeply reflect our country's firm steps and determination to promote high-quality development.
behind the heavy equipment of a great country, there is not only the determination of the country to develop the economy and build a strong country, but also the contribution of financial resources to escort major projects and support the green economy. as one of the financial forces closely related to the real economy, financial leasing actively participates in the construction of major national engineering facilities with the industry advantages of "financing + financing of goods", and contributes to the high-quality development momentum of the industry.
in the field of engineering construction, ping an leasing allocates financial resources to major engineering construction projects such as hydropower, wind power, and water conservancy, providing comprehensive financial service solutions for many domestic engineering construction companies and safeguarding the heavy equipment of a great country. by the end of 2023, ping an leasing has invested nearly 120 billion yuan in the field of engineering construction, supporting more than 750 high-quality enterprises in china's engineering construction industry, and covering more than 29 provincial regions, gathering the power of construction and building a prosperous people's livelihood.
a great nation marches forward with great strides despite wind and rain
after new year's day 2024, at the construction site of the zala hydropower station on the yuqu river at an altitude of 3,100 meters, the roar of dozens of excavation and loading equipment was heard continuously. as the huge stones weighing thousands of pounds were poured into the pass that was about to be closed, the winding yuqu river stopped here. since then, the construction of the zala hydropower station, the world's largest single-unit impulse hydropower unit project, has entered an important stage of main project construction, carrying the expectations of millions of residents on the banks of the yuqu river.
the yuqu river, about 444 kilometers long, is a first-level tributary on the left bank of the middle reaches of the nujiang river. it has thousands of gullies, rolling waves, abundant water, and its source is nearly 5,000 meters above sea level. the drop is concentrated, which is a good water energy storage resource, but it has not been developed. for many years, power shortages and unstable voltage have become the norm for residents along the yuqu river, and they look forward to having a stable power supply. now, the zala hydropower station has successfully intercepted the flow, which means that the project has entered the construction stage. as a result, the dream of residents along the yuqu river for stable electricity will soon be realized, and the grand concept of "sending electricity from tibet" will gradually become a reality.
as the first million-level hydropower station in tibet, zara hydropower station is a key project started during the country's "14th five-year plan" period, and it is also the world's largest impulse turbine generator set. the project is built by china hydropower fourth engineering bureau co., ltd. after the hydropower station is put into operation, the annual power generation can reach 3.946 billion kwh, which can save 1.3 million tons of standard coal each year, but such a large-scale project also means "large investment and difficulty". the total static investment of zara hydropower station is 12 billion yuan. the phased advancement of the entire project is inseparable from the support of various financial institutions, and ping an leasing is one of them.
during the main construction phase of the zara hydropower station project, the construction party had a need to advance funds due to the large amount of project funds and many participants. after understanding the basic situation of the project, ping an leasing actively connected with the fourth engineering bureau of china water resources and hydropower, and through full communication, understood the project's funding needs. with years of professional experience in this field, it sorted out the timing of the project's funding needs, and formulated professional and accurate financial service plans at important nodes such as hydropower station closure, dam capping, sluice water storage, and hydropower station commissioning, and tailored the repayment rhythm according to the project's payment situation to maximize the value of funds. with the financial support of ping an leasing, the project construction can be carried out more efficiently and smoothly.
in addition to the grand narrative, the majestic national equipment has also driven the development of the local economy. people who have lived here for a long time not only see the green mountains and clear waters, but also see another possibility of life. ping an leasing has also contributed its financial leasing power to the green mountains and clear waters.
from "black and smelly rivers" to "ecological green corridors", helping to polish the ecological filter
"the river is wider, the water is clearer, the flowers are red and the willows are green. the mother river has taken on new vitality."
as the mother river of dancheng people, minghe river has not only nurtured countless dancheng people for thousands of years, but also carried dancheng's profound historical and cultural heritage. this minghe river, which runs through the city, was once eroded by domestic sewage and industrial wastewater, and became a stinking river that is difficult to manage. today, the people of dancheng county are laughing and strolling here with their elderly and children. "clear water, blue sky, green grass, and beautiful scenery" have become the heartfelt praises of residents after swimming. this historic change stems from henan province's efforts to coordinate and promote the clear water project action plan in recent years. the management of the ecological water system of minghe river is a microcosm of the water basin management in henan province.
in 2018, china first metallurgical group, as the main force in the comprehensive improvement of the minghe river system, made every effort to promote the construction of the black and odorous water treatment and environmental landscape improvement project of the minghe river ecological water system in dancheng county. by treating and conserving water, an ecological self-healing water environment was created, which played a good demonstration effect in ensuring the ecological and environmental protection improvement project and also helped dancheng polish the ecological "filter".
sewage interception, dredging, revetment, and reservoir construction... every task in this battle to build an ecological water system with a total investment of 2.78 billion yuan cannot be separated from financial support, and financial resources such as banks and financial leasing have gathered here. the project's funding needs also gave ping an leasing, which has been committed to supporting the construction of major engineering facilities for many years, an opportunity. after learning about the project's funding ratio requirements, ping an leasing rushed to dancheng as soon as possible. through full communication with china first metallurgical group, it matched and designed product solutions with more reasonable financing terms, more flexible repayment methods, and better funding costs around various funding nodes, contributing to the flow of financial leasing power for the project.
"protecting the clear water of a river, nurturing local industries, and creating a prosperous city" is the true background of this livelihood project. as a cooperative enterprise of china first metallurgical group, ping an leasing has helped the ming river to undergo a magnificent transformation with the power of financial leasing, and has jointly created a natural ecological landscape of "five belts, five parks, one ring and multiple points", returning clear water and blue sky to the 1.4 million people of dancheng.
lighting up thousands of homes and enabling green transformation
on the top of the mountain in tianmenling scenic spot in jiangxi province, nearly 100 snow-white windmills are running day and night, silently guarding the vast "energy territory". clean electricity is being continuously delivered to thousands of households, lighting up thousands of lights. the blue sky, rivers and sunshine on the land of linchuan are witnessing the strategic transformation of regional green development. behind it, green finance is also rushing here, becoming an indispensable part of the low-carbon transformation of energy.
in recent years, jiangxi province has accelerated the pace of adjusting and optimizing its energy structure, building a clean and low-carbon energy system, and accelerating the high-proportion and high-quality development of wind power and photovoltaic power generation. the maopai distributed wind power 35kv transmission project in linchuan district, fuzhou, jiangxi is one of the key projects. after the completion of the project, it will better meet the electricity needs of local residents. due to the shortage of prepaid funds and high requirements for the construction and operation of wind turbines, which became bottlenecks restricting the construction of the project, ping an leasing reached a cooperation with china power construction group jiangxi electric power construction co., ltd. during this period to jointly ensure the smooth progress of the project.
after an in-depth visit and learning about the project's urgent funding needs, ping an leasing designed a combination of short-term and long-term funding products based on the project information provided by china power engineering group, to improve customers' capital utilization efficiency, alleviate capital payment pressure, reduce customers' financing costs, ensure project capital turnover, and fully meet the funding needs of the project at different stages: the early stage, investment period, construction period, and operation period, bringing a financial "east wind" to project construction.
with equipment as the core, financial leasing allows financial resources to flow to key areas and weak links in the energy low-carbon transformation, so that the "double carbon pulse" in the green mountains and clear waters can continue to beat. ping an leasing will continue to enable the green energy low-carbon transformation, lay a solid foundation for environmental protection and the development of green industries, and strive to write a great chapter in green finance.
from the zara hydropower station, to the minghe river ecological water system management project, to the linchuan district maopai distributed wind power project, all of them bear witness to the development path of my country's major national equipment. on this development path, financial forces from all walks of life also travel together. over the past 11 years, ping an leasing has insisted on serving the real economy and supporting major national equipment with innovative financial solutions. in the future, ping an leasing will continue to work hard and inject financial vitality into the construction of a modern industrial system, and continue to serve the high-quality development of the industry. (china daily)
report/feedback