Decoration is a complicated process. Many novices do not understand the order of decoration when they first decorate, and have no idea of ​​the basic requirements of each stage of construction, so they take a lot of detours on the road of decoration and spend a lot of money in vain. In fact, different construction stages have their own specific requirements and precautions. The following are the basic construction requirements and pitfall avoidance suggestions for each stage, which novices must keep in mind.

1. Hydropower stage:



After the main renovation, we will enter an important step - water and electricity renovation. This link is a hidden project, so it must be treated with caution. Once there is a problem in any link, it is easy to cause a serious accident.

During the hydropower phase, it is necessary to ensure that the hydropower wiring is reasonable, safe and in compliance with the regulations:

  • ① “Horizontal and vertical” is not necessary, as this will waste materials, a large amount of pipes, and invisibly increase decoration costs.
  • ② Water pipes and electrical materials must be inspected when they arrive at the site. Make sure that the brands of water pipes and pipe fittings are consistent and that the electrical wires meet national standards.
  • ③ The sewer pipe should have a water trap, which is more effective than an odor-proof floor drain.



  • ④ Home appliances that require water supply and drainage must be listed in advance and planned well.
  • ⑤ If you want to consider installing surveillance at the front door, you need to lay the wiring in advance, otherwise it will not be installed later.
  • ⑥ If you plan to pre-embed faucets, showers, etc., you should buy them in advance and place the embedded parts during the water and electricity renovation.



  • ⑦ When decorating, you should go to the site to experience it more often, think about the future living scene based on the water and electricity points opened by the master, and see if there is anything that needs improvement.
  • ⑧The refrigerator needs to be powered on 24 hours a day. To ensure electricity safety, it must be wired separately and not use the same socket as other electrical appliances.
  • ⑨Finally, you can prepare an electrician's professional test pen in advance and test each socket later to see if it is powered. At the same time, test whether the sewer is unobstructed and whether the floor drain is blocked.

2. Waterproof stage:



Waterproofing is also the most important part of concealed engineering. Once there is a problem, it is likely to affect the neighbors downstairs and cause discord in neighborhood relations.

  • ① When doing waterproofing, you must pay attention to the master's painting method and the number of times of painting. For example, the waterproofing of the bathroom generally needs 2 to 3 times. The corners between the wall and the floor should also be painted several times to prevent leakage in other rooms of the house in the future.
  • ② The waterproof height of the bathroom with shower should be more than 1.8m. The waterproof height of the wash basin and washing machine should reach 1.2m, and the height of other areas should be 30cm. The balcony should also be waterproofed and a 48-hour closed water test should be carried out. The ground should retain some slope to facilitate drainage.



  • ③ There should be at least a 2-3cm height difference between the balcony and the living room or bedroom floor to prevent rainwater from entering the room in case of strong winds and heavy rain.

3. Carpentry stage:



As one of the four major projects in the basic construction of decoration, the carpentry stage is equally important in the entire decoration process. Today's carpentry is different from the previous carpentry. In the past, many carpenters needed to build cabinets on site, but now with the whole house customization, most carpenters are responsible for the ceiling, TV background wall modeling, wooden floor installation, door and window frames, etc.

  • ① There is no need to make the ceiling too complicated, which will not only cost more but also reduce the floor height. Choose a double-eyelid ceiling with a 3cm staggered layer. The surface of the ceiling should be flat and smooth, without hollows, bubbles, or peeling. The latex paint should be firm and without hollows.



  • ② If there is no main light design, and you want to do a full hanging, give priority to strong light steel keel. If it is just a side hanging, wooden keel is more suitable.
  • ③ The TV background wall is also designed in the home. The load-bearing position of the wall needs to be primed with European pine board.



  • ④ If you install central air conditioning, ask the carpenter to extend the air outlet to make it more beautiful and elegant.
  • ⑤ When installing wooden doors on site, you must be present on site to ensure that the door opens in the correct direction before letting the master open the keyhole. If you make a mistake, it will be troublesome.

4. Bricklaying stage:

The tile work stage is also a very important link. All the work that requires plastering and plastering in the house is completed at this stage, including but not limited to wall construction, waterproofing, kitchen and bathroom tiles, floor tiles, window sills, threshold stones, etc. The quality of the tile workmanship not only affects the overall effect, but also leaves hidden dangers in the later residential use.



  • ① When buying tiles, choose those with a production base in Foshan, Guangdong. The color should be light rather than dark, and the patterns should not be too heavy. The simpler and more elegant the better.
  • ② Except for the bathroom, try not to use door stones. The whole floor looks grand, but never make it a fake one. When the whole floor is laid, half bricks should be placed in an invisible or inconspicuous position as much as possible.



  • ③The outside corners of the ceramic tiles must be made into crabapple corners, which will have a much better finishing effect, and the later beautiful seams will look better than the edge strips.
  • ④ It is best to cut the small brick strips in advance. Machine cutting is neater than bricklaying cutting, and there are fewer wasted bricks.
  • ⑤ Cover the door frame with tiles, and later you can make a single-wrapped door frame, which is more minimalist.
  • ⑥ Tell the bricklayer in advance that he wants to use strong pressure-lowering technology instead of ground-pressure walls.
  • ⑦ Remember to make drainage slope in the bathroom and balcony.



In short, there are many details that need to be paid attention to in each stage of decoration. When we are decorating, we must communicate well with the construction team, regularly check the construction progress and quality, and solve problems in time to ensure that the decoration process goes smoothly and achieves satisfactory decoration results.